Relocation of measuring laboratory

This year in ORO Orodjarna we are doing a large rearrangement of the production with the aim of obtaining a more optimized and linear production process. One of the changes is the relocation of the measuring laboratory into a newly designed place in the center/core of production.

The measuring laboratory started to work on a new location in September 2023. This has provided us with better working conditions, easier communication, and, above all, easier and faster access to the measuring laboratory.

New Hartford MVP-16
Back to the list
Relief after floods / Floods in Slovenia, Aug...
Back to the top